Fiber Cement Helps Greer Stafford Construct Los Lunas High School Replacement Project - AZTV7/Cable 13, Me-TV 7.2, HSN 7.3, Phoenix-Prescott, AZ

Fiber Cement Helps Greer Stafford Construct Los Lunas High School Replacement Project

Posted: Updated:

American Fiber Cement provides Fiber Cement products for High School Reconstruction.

Littleton, CO, US – November 25, 2013 /MarketersMedia/ —

American Fiber Cement (AFC) is known for its durable and expert products that withstand the test of time and severe weather. Recently, Greer Stafford/SJCF Architecture was chosen to construct a two-phase high school replacement project at Los Lunas High School located in Los Lunas, New Mexico. At the onset of the project, the existing building system had drainage problems, decades of haphazard development work and a structure that was past its shelf life.

As an expert in constructing buildings, Greer Stafford understands the durability, reliability and sustainability of American Fiber Cement products. They purchased nearly 17,500 square feet from AFC of Eter Color Ochre Yellow and Gray fiber cement panels for the project. This through-color, autoclaved and high-density fiber cement board is a great alternative to other more expensive building materials used for exterior cladding. It is lightweight, fast and easy to install and most importantly, durable.

To promote responsible and sustainable building design, Greer Stafford used American Fiber Cement’s rain screen system, which accommodates for the use of exterior insulation. They purchased nearly 15,000 square feet of the 1.5” Thermafiber Rainbarrier 45 mineral wool insulation. AFC’s system not only helps insulate the building, but also manages moisture properly and regulates temperatures saving countless dollars in heating and cooling costs.

They used American Fiber Cement products to reconstruct the classroom wings and a new single two-story building that will be used to house four learning communities. The construction project also includes a new courtyard that will allow the school’s students to gather outside while still creating a supervised and secured campus. This plan will complete Phase 1 of the construction plans.

Phase 2 of the plan is scheduled to begin October 2013 and will include nearly 160,000 square feet of demolition as well as 27,000 square feet of portables. Greer Stafford will use American Fiber Cement products in order to create approximately 195,000 square feet of new construction to complete the replacement project. For more information on high-quality reinforced cement building products, visit www.americanfibercement.com.

About American Fiber Cement Corporation:
American Fiber Cement Corporation has nearly 20 years of extensive experience making the some of the finest cement products for various construction sites. They specialize in distributing some of the best European cement products that are durable and withstand all that nature can throw at them including rain, snow, hail or wind. AFC’s cement products are built in order to last. They are the master distributor of these products within the United States.

For more information about us, please visit http://www.americanfibercement.com

Contact Info:
Name: Donna Anglada
Email: afccladding@gmail.com
Phone: (303)-978-1199
Organization: American Fiber Cement

Source: http://marketersmedia.com/fiber-cement-helps-greer-stafford-construct-los-lunas-high-school-replacement-project/26240

Powered by WorldNow
All content © Copyright 2000 - 2014 WorldNow and AZ-TV. All Rights Reserved.
For more information on this site, please read our Privacy Policy and Terms of Service.